Summary of proposal
Party
Australian Greens
Portfolio
Climate Change, Energy, the Environment and Water
Policy Topic
Energy

The proposal would expand the national target of the Capacity Investment Scheme (CIS) from 82% renewable electricity by 2030 to 100% by 2030 and accelerate the staged closure of coal plants before 31 December 2030, in the National Electricity Market (NEM) and the South West Interconnected System (SWIS).

  • The management of the coal closure timeline would be undertaken by the Australian Energy Market Operator (AEMO), who would be empowered to develop a plan to accelerate the closure of coal capacity to 2030.
  • Below is the proposed timeline for closure:
Year NEM Coal Fired Capacity (MW) SWIS Coal Fired Capacity (MW)
2025 21,255 1,366
2026 18,375 1,173
2027 18.375 1,173
2928 12,945 856
2029 9,066 856
2030 0 0

The proposal would start on 1 July 2025.